Bosch D122L Dual Battery Harness with Long Leads

& Free Shipping

  • Used for batteries in parallel in a separate enclosure
  • Slide-on connectors
  • Built-in circuit breaker protection

Special Order

Want to be notified when this product is back in stock?

SKU: DS-D122L Category: Brand:

Description

Use the D122L Dual battery harness with long leads when batteries are in a separate enclosure from the control panel. It protects the installer and battery when connecting two batteries, in parallel, to compatible control panels. The D122L eliminates the hazards of batteries connected in parallel by utilizing a thermal circuit breaker to govern the circuit. It breaks the electrical circuit of the second battery when the thermal rating is exceeded.

  • Used for batteries in parallel in a separate enclosure
  • Slide-on connectors
  • Built-in circuit breaker protection

Additional information

Weight 1 lbs
Brand